Schedule III - Real Estate and Accumulated Depreciation (Detail) - USD ($)  $ in Thousands  | 
12 Months Ended | 
 | 
 | 
Dec. 31, 2020  | 
Dec. 31, 2019  | 
Dec. 31, 2018  | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 627,690
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
706,070
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
123,712
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
198,513
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
7,263
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
55,975
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
3,907
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
713,332
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
179,686
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
202,420
 | 
$ 107,941
 | 
 
 | 
| Total cost | 
1,095,439
 | 
827,255
 | 
$ 563,004
 | 
| Accumulated depreciation | 
(49,236)
 | 
(35,174)
 | 
(24,051)
 | 
| Aggregate cost | 
1,095,439
 | 
$ 827,255
 | 
$ 563,004
 | 
| Miscellaneous Investments | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Encumbrances | 
26,257
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
35,112
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
8,687
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
4,194
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
58
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
2,657
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
974
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
35,169
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
11,345
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
5,168
 | 
 
 | 
 
 | 
| Total cost | 
51,683
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(4,187)
 | 
 
 | 
 
 | 
| Aggregate cost | 
51,683
 | 
 
 | 
 
 | 
| Land, Buildings, Improvements & Permanent Plantings | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Total cost | 
1,100,000
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 1,100,000
 | 
 
 | 
 
 | 
| Buildings and Improvements | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Estimated useful life | 
39 years
 | 
 
 | 
 
 | 
| Permanent plantings | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Estimated useful life | 
40 years
 | 
 
 | 
 
 | 
| Santa Cruz County, California | Land & Improvements | Date Acquired 6/16/1997 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Jun. 16,  1997
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 7,929
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
4,350
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
0
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
579
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
4,350
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
579
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
4,929
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(341)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 4,929
 | 
 
 | 
 
 | 
| Santa Cruz County, California | Land & Improvements | Date Acquired 1/3/2011 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Jan.  03,  2011
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 6,914
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
8,328
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
0
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
443
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
527
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
8,771
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
527
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
9,298
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(171)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 9,298
 | 
 
 | 
 
 | 
| Santa Cruz County, California | Land, Buildings & Improvements | Date Acquired 6/13/2014 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Jun. 13,  2014
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 3,012
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
5,576
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
207
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
12
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
5,576
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
219
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
5,795
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(208)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 5,795
 | 
 
 | 
 
 | 
| Ventura County, California | Land & Improvements | Date Acquired 11/4/2014 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Nov.  04,  2014
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 3,180
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
5,860
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
92
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
2
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
5,860
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
94
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
5,954
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(58)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 5,954
 | 
 
 | 
 
 | 
| Ventura County, California | Land & Improvements | Date Acquired 8/28/2019 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Aug. 28,  2019
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 13,059
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
20,602
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
397
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
172
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
1,163
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
20,774
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
1,560
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
22,334
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(152)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 22,334
 | 
 
 | 
 
 | 
| Ventura County, California | Land & Improvements | Date Acquired 12/15/2020 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Dec. 15,  2020
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 12,450
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
19,215
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
1,264
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
50
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
19,265
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
1,264
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
20,529
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(5)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 20,529
 | 
 
 | 
 
 | 
| Ventura County, California | Land, Buildings & Improvements | Date Acquired 9/15/1998 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Sep. 15,  1998
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 30,899
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
9,895
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
5,256
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
293
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
9,895
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
5,549
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
15,444
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(4,306)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 15,444
 | 
 
 | 
 
 | 
| Ventura County, California | Land, Buildings & Improvements | Date Acquired 7/23/2014 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Jul. 23,  2014
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 2,241
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
6,219
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
505
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
85
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
6,219
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
590
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
6,809
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(229)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 6,809
 | 
 
 | 
 
 | 
| Ventura County, California | Land, Buildings & Improvements | Date Acquired 10/29/2014 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Oct. 29,  2014
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 15,741
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
23,673
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
350
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
2,166
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
23,673
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
2,516
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
26,189
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(569)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 26,189
 | 
 
 | 
 
 | 
| Hillsborough County, Florida | Land, Buildings & Improvements | Date Acquired 9/12/2012 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Sep. 12,  2012
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 2,575
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
2,199
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
1,657
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
14
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
1,328
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
2,213
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
2,985
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
5,198
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(1,219)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 5,198
 | 
 
 | 
 
 | 
| Monterey County, California | Land & Improvements | Date Acquired 7/11/2019 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Jul. 11,  2019
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 5,860
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
8,629
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
254
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
1,192
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
1,698
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
9,821
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
1,952
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
11,773
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(69)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 11,773
 | 
 
 | 
 
 | 
| Monterey County, California | Land, Buildings & Improvements | Date Acquired 10/21/2013 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Oct. 21,  2013
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 4,956
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
7,187
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
164
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
180
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
3,118
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
7,367
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
3,282
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
10,649
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(727)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 10,649
 | 
 
 | 
 
 | 
| Monterey County, California | Land, Buildings & Improvements | Date Acquired 1/5/2015 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Jan.  05,  2015
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 10,673
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
15,852
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
582
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
(156)
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
1,426
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
15,696
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
2,008
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
17,704
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(765)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 17,704
 | 
 
 | 
 
 | 
| Cochise County, Arizona | Land, Buildings & Improvements | Date Acquired 12/27/2013 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Dec. 27,  2013
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 2,940
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
6,168
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
572
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
8
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
4,548
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
6,176
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
5,120
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
11,296
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(1,118)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 11,296
 | 
 
 | 
 
 | 
| Cochise County, Arizona | Land, Buildings & Improvements | Date Acquired 12/23/2015 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Dec. 23,  2015
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 3,210
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
4,234
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
1,502
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
5
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
3,298
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
4,239
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
4,799
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
9,038
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(791)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 9,038
 | 
 
 | 
 
 | 
| Kern County, California | Land & Improvements | Date Acquired 7/25/2014 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Jul. 25,  2014
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 2,925
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
5,841
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
67
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
993
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
5,841
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
1,060
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
6,901
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(382)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 6,901
 | 
 
 | 
 
 | 
| Kern County, California | Land & Improvements | Date Acquired 9/3/2015 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Sep.  03,  2015
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 16,324
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
18,893
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
497
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
688
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
5,959
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
1,418
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
19,581
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
6,456
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
1,418
 | 
 
 | 
 
 | 
| Total cost | 
27,455
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(1,986)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 27,455
 | 
 
 | 
 
 | 
| Kern County, California | Land & Improvements | Date Acquired 1/31/2018 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Jan. 31,  2018
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 1,358
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
2,733
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
249
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
(4)
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
1,526
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
2,729
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
1,775
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
4,504
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(128)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 4,504
 | 
 
 | 
 
 | 
| Kern County, California | Land, Improvements & Permanent Plantings | Date Acquired 6/24/2020 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Jun. 24,  2020
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 8,500
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
12,521
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
1,325
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
370
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
12,521
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
1,325
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
370
 | 
 
 | 
 
 | 
| Total cost | 
14,216
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
0
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 14,216
 | 
 
 | 
 
 | 
| Manatee County, Florida | Land, Buildings & Improvements | Date Acquired 9/29/2014 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Sep. 29,  2014
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 9,001
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
8,466
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
5,426
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
667
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
8,466
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
6,093
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
14,559
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(3,296)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 14,559
 | 
 
 | 
 
 | 
| Manatee County, Florida | Land, Buildings & Improvements | Date Acquired 3/10/2015 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Mar. 10,  2015
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 3,750
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
2,403
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
1,871
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
84
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
2,403
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
1,955
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
4,358
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(1,024)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 4,358
 | 
 
 | 
 
 | 
| Hendry County, Florida | Land, Buildings & Improvements | Date Acquired 6/25/2015 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Jun. 25,  2015
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 10,356
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
14,411
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
789
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
14,411
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
789
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
15,200
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(626)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 15,200
 | 
 
 | 
 
 | 
| Rock County, Nebraska | Land, Buildings & Improvements | Date Acquired 8/20/2015 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Aug. 20,  2015
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 3,516
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
4,862
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
613
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
4,862
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
613
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
5,475
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(421)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 5,475
 | 
 
 | 
 
 | 
| Holt County, Nebraska | Land, Buildings & Improvements | Date Acquired 8/20/2015 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Aug. 20,  2015
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 3,534
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
4,690
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
786
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
4,690
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
786
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
5,476
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(346)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 5,476
 | 
 
 | 
 
 | 
| Saguache County, Colorado | Land, Buildings & Improvements | Date Acquired 3/3/2016 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Mar.  03,  2016
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 15,313
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
16,756
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
8,348
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
1,486
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
16,756
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
9,834
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
26,590
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(4,540)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 26,590
 | 
 
 | 
 
 | 
| Fresno County, California | Land & Improvements | Date Acquired 8/16/2019 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Aug. 16,  2019
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 40,811
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
24,772
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
13,410
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
31,420
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
4
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
8
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
10
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
24,776
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
13,418
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
31,430
 | 
 
 | 
 
 | 
| Total cost | 
69,624
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(2,295)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 69,624
 | 
 
 | 
 
 | 
| Fresno County, California | Land & Improvements | Date Acquired 9/3/2020 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Sep.  03,  2020
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 18,764
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
15,071
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
4,680
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
11,921
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
28
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
15,071
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
4,708
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
11,921
 | 
 
 | 
 
 | 
| Total cost | 
31,700
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(278)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 31,700
 | 
 
 | 
 
 | 
| Fresno County, California | Land & Improvements | Date Acquired 10/1/2020 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Oct.  01,  2020
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 18,817
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
7,128
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
9,206
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
15,242
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
33
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
7,161
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
9,206
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
15,242
 | 
 
 | 
 
 | 
| Total cost | 
31,609
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(283)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 31,609
 | 
 
 | 
 
 | 
| Fresno County, California | Land, Improvements & Permanent Plantings | Date Acquired 4/5/2016 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Apr.  05,  2016
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 8,117
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
3,623
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
1,228
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
11,455
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
196
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
3,623
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
1,424
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
11,455
 | 
 
 | 
 
 | 
| Total cost | 
16,501
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(2,401)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 16,501
 | 
 
 | 
 
 | 
| Fresno County, California | Land, Improvements & Permanent Plantings | Date Acquired 10/13/2016 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Oct. 13,  2016
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 3,501
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
2,937
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
139
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
3,452
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
2,937
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
139
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
3,452
 | 
 
 | 
 
 | 
| Total cost | 
6,528
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(769)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 6,528
 | 
 
 | 
 
 | 
| Fresno County, California | Land, Improvements & Permanent Plantings | Date Acquired 7/17/2017 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Jul. 17,  2017
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 7,110
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
5,048
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
777
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
7,818
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
2
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
1,364
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
5,050
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
2,141
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
7,818
 | 
 
 | 
 
 | 
| Total cost | 
15,009
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(1,548)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 15,009
 | 
 
 | 
 
 | 
| Fresno County, California | Land, Improvements & Permanent Plantings | Date Acquired 12/15/2017 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Dec. 15,  2017
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 3,207
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
2,016
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
324
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
3,626
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
(1)
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
(3)
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
2,015
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
324
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
3,623
 | 
 
 | 
 
 | 
| Total cost | 
5,962
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(1,092)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 5,962
 | 
 
 | 
 
 | 
| Saint Lucie County, Florida | Land, Buildings & Improvements | Date Acquired 7/1/2016 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Jul.  01,  2016
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 2,743
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
4,165
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
971
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
4,165
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
971
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
5,136
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(437)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 5,136
 | 
 
 | 
 
 | 
| Baca County, Colorado | Land & Improvements | Date Acquired 12/28/2016 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Dec. 28,  2016
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 6,763
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
11,430
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
278
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
11,430
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
278
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
11,708
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(222)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 11,708
 | 
 
 | 
 
 | 
| Baca County, Colorado | Land & Buildings | Date Acquired 9/1/2016 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Sep.  01,  2016
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 3,498
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
6,167
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
214
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
6,167
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
214
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
6,381
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(62)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 6,381
 | 
 
 | 
 
 | 
| Merced County, Colorado | Land & Improvements | Date Acquired 9/14/2016 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Sep. 14,  2016
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 7,696
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
12,845
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
504
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
190
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
12,845
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
694
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
13,539
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(106)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 13,539
 | 
 
 | 
 
 | 
| Stanislaus County, Colorado | Land & Improvements | Date Acquired 9/14/2016 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Sep. 14,  2016
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 8,337
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
14,114
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
45
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
463
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
14,114
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
508
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
14,622
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(82)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 14,622
 | 
 
 | 
 
 | 
| Martin County, Florida | Land & Improvements | Date Acquired 1/12/2017 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Jan. 12,  2017
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 32,400
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
52,443
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
1,627
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
52,443
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
1,627
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
54,070
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(260)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 54,070
 | 
 
 | 
 
 | 
| Martin County, Florida | Land & Improvements | Date Acquired 7/22/2019 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Jul. 22,  2019
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 36,733
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
51,691
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
6,595
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
4
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
1
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
51,695
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
6,596
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
58,291
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(734)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 58,291
 | 
 
 | 
 
 | 
| Yuma County, Arizona | Land & Improvements | Date Acquired 6/1/2017 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Jun.  01,  2017
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 13,694
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
12,390
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
12,191
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
151
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
18,207
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
12,541
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
30,398
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
42,939
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(4,145)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 42,939
 | 
 
 | 
 
 | 
| Santa Barbara County, California | Land, Improvements & Permanent Plantings | Date Acquired 8/9/2017 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Aug.  09,  2017
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 3,225
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
4,559
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
577
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
397
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
(50)
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
148
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
1,494
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
4,509
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
724
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
1,891
 | 
 
 | 
 
 | 
| Total cost | 
7,124
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(403)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 7,124
 | 
 
 | 
 
 | 
| Okeechobee County, Florida | Land & Improvements | Date Acquired 8/9/2017 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Aug.  09,  2017
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 5,230
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
9,111
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
953
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
985
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
1,094
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
10,096
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
2,047
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
12,143
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(377)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 12,143
 | 
 
 | 
 
 | 
| Walla Walla County, WA | Land, Improvements & Permanent Plantings | Date Acquired 9/8/2017 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Sep.  08,  2017
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 4,860
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
5,286
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
401
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
3,739
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
5,286
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
401
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
3,739
 | 
 
 | 
 
 | 
| Total cost | 
9,426
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(1,724)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 9,426
 | 
 
 | 
 
 | 
| Collier & Hendry, FL | Improvements | Date Acquired 7/12/2018 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Jul. 12,  2018
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 21,504
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
36,223
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
344
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
1
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
36,224
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
344
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
36,568
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(121)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 36,568
 | 
 
 | 
 
 | 
| Kings County, California | Land, Improvements & Permanent Plantings | Date Acquired 9/13/2018 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Sep. 13,  2018
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 4,025
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
3,264
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
284
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
3,349
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
5
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
5
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
3,269
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
284
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
3,354
 | 
 
 | 
 
 | 
| Total cost | 
6,907
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(237)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 6,907
 | 
 
 | 
 
 | 
| Madera, California | Land & Improvements | Date Acquired 4/9/2019 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Apr.  09,  2019
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 17,130
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
8,074
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
2,696
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
17,916
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
525
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
8,074
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
3,221
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
17,916
 | 
 
 | 
 
 | 
| Total cost | 
29,212
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(1,613)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 29,212
 | 
 
 | 
 
 | 
| Madera, California | Land, Improvements & Permanent Plantings | Date Acquired 11/1/2018 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Nov.  01,  2018
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 13,385
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
12,305
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
1,718
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
9,015
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
13
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
2
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
9
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
12,318
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
1,720
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
9,024
 | 
 
 | 
 
 | 
| Total cost | 
23,062
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(725)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 23,062
 | 
 
 | 
 
 | 
| Hartley County, Texas | Land & Improvements | Date Acquired 11/20/2018 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Nov. 20,  2018
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 5,117
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
7,320
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
1,054
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
3
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
96
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
7,323
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
1,150
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
8,473
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(145)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 8,473
 | 
 
 | 
 
 | 
| Allegran And Van Buren County, Michigan | Land & Improvements | Date Acquired 6/4/2019 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Jun.  04,  2019
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 2,996
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
1,634
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
800
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
2,694
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
1,634
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
800
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
2,694
 | 
 
 | 
 
 | 
| Total cost | 
5,128
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(291)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 5,128
 | 
 
 | 
 
 | 
| Yolo Country, California | Land & Improvements | Date Acquired 6/13/2019 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Jun. 13,  2019
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 5,073
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
5,939
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
665
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
2,648
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
5,939
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
665
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
2,648
 | 
 
 | 
 
 | 
| Total cost | 
9,252
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(215)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 9,252
 | 
 
 | 
 
 | 
| Napa County, California | Land & Improvements | Date Acquired 8/29/2019 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Aug. 29,  2019
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 18,262
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
27,509
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
1,646
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
2,923
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
3,235
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
30,744
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
1,646
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
2,923
 | 
 
 | 
 
 | 
| Total cost | 
35,313
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(510)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 35,313
 | 
 
 | 
 
 | 
| Hayes County, Nebraska | Land & Improvements | Date Acquired 10/7/2019 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Oct.  07,  2019
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 3,045
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
4,750
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
264
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
16
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
1
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
4,766
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
265
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
5,031
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(55)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 5,031
 | 
 
 | 
 
 | 
| Hayes & Hitchcock County, Nebraska | Land & Improvements | Date Acquired 10/7/2019 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Oct.  07,  2019
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 5,739
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
9,275
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
431
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
20
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
1
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
9,295
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
432
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
9,727
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(100)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 9,727
 | 
 
 | 
 
 | 
| Phillips County, Colorado | Land & Improvements | Date Acquired 1/15/2020 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Jan. 15,  2020
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 4,500
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
6,875
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
660
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
6,875
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
660
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
7,535
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(63)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 7,535
 | 
 
 | 
 
 | 
| Wicomico, Sussex and Caroline County, Maryland | Land & Improvements | Date Acquired 8/31/2020 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Aug. 31,  2020
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 4,481
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
6,703
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
626
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
36
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
6,703
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
662
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost | 
7,365
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(21)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 7,365
 | 
 
 | 
 
 | 
| Tulare County, California | Land & Improvements | Date Acquired 12/17/2020 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Dec. 17,  2020
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 22,319
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
26,952
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
6,420
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
28,152
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
77
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
27,029
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
6,420
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
28,152
 | 
 
 | 
 
 | 
| Total cost | 
61,601
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(110)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 61,601
 | 
 
 | 
 
 | 
| Tulare County, California | Land & Improvements | Date Acquired 12/31/2020 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Dec. 31,  2020
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 0
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
1,082
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
1,154
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
1,977
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
31
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
1,113
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
1,154
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
1,977
 | 
 
 | 
 
 | 
| Total cost | 
4,244
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
0
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 4,244
 | 
 
 | 
 
 | 
| San Joaquin County, California | Land, Improvements & Permanent Plantings | Date Acquired 12/24/2020 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Dec. 24,  2020
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 20,615
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
8,219
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
7,228
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
16,281
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
41
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
8,260
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
7,228
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
16,281
 | 
 
 | 
 
 | 
| Total cost | 
31,769
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(59)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 31,769
 | 
 
 | 
 
 | 
| Whatcom County, Washington | Land, Improvements & Permanent Plantings | Date Acquired 12/24/2020 | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Date Acquired | 
Dec. 24,  2020
 | 
 
 | 
 
 | 
| Encumbrances | 
$ 22,750
 | 
 
 | 
 
 | 
| Initial cost, land and land improvements | 
12,265
 | 
 
 | 
 
 | 
| Initial cost, buildings & improvements | 
2,142
 | 
 
 | 
 
 | 
| Initial cost, horticulture | 
19,924
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, land improvements | 
38
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, building & improvements | 
0
 | 
 
 | 
 
 | 
| Subsequent capitalized additions, horticulture | 
0
 | 
 
 | 
 
 | 
| Total cost, land and land improvements | 
12,303
 | 
 
 | 
 
 | 
| Total cost, buildings & improvements | 
2,142
 | 
 
 | 
 
 | 
| Total cost, horticulture | 
19,924
 | 
 
 | 
 
 | 
| Total cost | 
34,369
 | 
 
 | 
 
 | 
| Accumulated depreciation | 
(89)
 | 
 
 | 
 
 | 
| Aggregate cost | 
$ 34,369
 | 
 
 | 
 
 | 
| Minimum | Equipment & Fixtures | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Estimated useful life | 
5 years
 | 
 
 | 
 
 | 
| Maximum | Equipment & Fixtures | 
 
 | 
 
 | 
 
 | 
| SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | 
 
 | 
 
 | 
 
 | 
| Estimated useful life | 
10 years
 | 
 
 | 
 
 |